Turbocharger supply for POWER plant
Over 10 years supplying turbochargers.
Marine and energy sectors.
We deliver quality.
Turbochargers supply for power plant
The turbochargers supply for power plant directly determines the performance of your facility. If you manage a CHP unit, choosing the right supplier marks the difference between record efficiency and operational losses. Let me explain how to get it right from the very first order.
Why turbocharger supply matters in cogeneration
In a CHP plant, the turbocharger boosts the gas or diesel engine. Therefore, it directly influences electrical and thermal efficiency. Furthermore, an undersized unit can reduce combined efficiency by up to 8%.
Did you know that modern cogeneration plants achieve efficiencies of 85-90% thanks to optimised turbochargers? For this reason, their selection leaves no room for improvisation.
Cogeneration plants power plant.
A quality service, wherever and whenever our clients need it.
Types of turbochargers for industrial cogeneration
There are three main families depending on the prime mover’s power output. Each configuration responds to specific thermal and mechanical needs:
- Axial turbos for engines above 5 MW.
- Radial units for powers between 1 and 5 MW.
- Variable geometry turbos for fluctuating loads.
- Two-stage systems for high electrical efficiency.
- Hybrid turbos with fast-response electric assistance.
Likewise, manufacturers such as ABB, MAN ES or Mitsubishi dominate the European spare parts market.
Technical criteria for a reliable supply
When evaluating the turbocharger supply for cogeneration plants, prioritise three critical parameters. Similarly, always verify the manufacturer’s documentary traceability.
The compression ratio must match the LHV of the fuel used. However, exhaust gas temperature should not exceed 650°C in continuous operation. On the other hand, the mass flow rate must align with the actual demand curve.
Lead times and logistics in turbocharger supply
Delivery times define the viability of any planned shutdown. For this reason, plan every critical component well in advance.
A new unit takes between 16 and 28 weeks from order placement. Likewise, OEM spare parts range between 4 and 12 weeks. Consequently, keeping strategic stock of rotors and cartridges is essential to avoid unplanned outages that cost thousands of euros per hour.
After-sales maintenance and supplier warranties
A reliable turbocharger supply for cogeneration plants includes continuous technical support. Furthermore, the recommended minimum warranty covers 8,000 operating hours or 18 months.
On the other hand, LTSA (Long Term Service Agreement) contracts reduce total cost of ownership by up to 22%. In short, always prioritise suppliers with a service network in your region.
How to optimise supply costs
Negotiating prices without sacrificing quality requires technical strategy. Similarly, bundling orders from multiple plants significantly reduces logistics costs.
Always request comparisons between OEM, certified spare parts and refurbished units. Lastly, demand ISO 9001 and ISO 14001 certifications from the chosen manufacturer.
Are you looking for a specialist in turbocharger supply for cogeneration plants? Contact us today and request your personalised quote. Our technical team responds within 24 hours with a tailored proposal.